Argan Inc. Files 8-K: Other Events & Financials

Ticker: AGX · Form: 8-K · Filed: Oct 30, 2025 · CIK: 100591

Sentiment: neutral

Topics: 8-K, filing, corporate-update

TL;DR

Argan Inc. filed an 8-K on 10/30/25 for other events and financials.

AI Summary

Argan Inc. filed an 8-K on October 30, 2025, reporting other events and financial statements. The filing does not contain specific financial figures or details about the 'other events' beyond its classification.

Why It Matters

This 8-K filing indicates Argan Inc. has submitted important corporate updates and financial information to the SEC, which could impact investor understanding of the company's status.

Risk Assessment

Risk Level: low — The filing is a standard procedural report without specific material events or financial disclosures that would immediately impact risk.

Key Players & Entities

FAQ

What specific 'Other Events' are being reported by Argan Inc. in this 8-K?

The filing indicates 'Other Events' as an item, but does not specify the nature of these events within the provided text.

When was this 8-K report filed by Argan Inc.?

The report was filed on October 30, 2025.

What is Argan Inc.'s state of incorporation?

Argan Inc. is incorporated in Delaware.

What is the principal executive office address for Argan Inc.?

The principal executive offices are located at 4075 Wilson Boulevard, Suite 440, Arlington, Virginia 22203.

Does this filing include specific financial statements or details?

The filing lists 'Financial Statements and Exhibits' as an item, but the provided text does not contain the specific financial details.

Filing Stats: 525 words · 2 min read · ~2 pages · Grade level 10.6 · Accepted 2025-10-30 16:20:31

Key Financial Figures

Filing Documents

01. Other Events

Item 8.01. Other Events. Today, Argan, Inc. ("Argan") issued a press release announcing that its wholly owned subsidiary, Gemma Power Systems, received full notice to proceed on an engineering, procurement and construction services contract with CPV Basin Ranch Holdings LLC, an affiliate of Competitive Power Ventures ("CPV"), the developer of the CPV Basin Ranch Energy Center located in Ward County, Texas. The 1,350 MW, 2–11 combined-cycle power plant featuring GE 7HA.03 turbines is being designed with the option to include a carbon capture capability. Construction is expected to begin this fall, with a current scheduled project completion date in 2028. The full amount of the contract value will be included in Argan's consolidated project backlog for the period ending October 31, 2025. A copy of Argan's press release is attached to this report as Exhibit 99.1 and is incorporated herein by reference.

01. Financial Statements and Exhibits

Item 9.01. Financial Statements and Exhibits. (d) Exhibits Exhibit No. Description 99.1 Press Release issued by Argan on October 30, 2025 104 Cover Page Interactive Data File (formatted as inline XBRL and contained in Exhibit 101)

SIGNATURES

SIGNATURES Pursuant to the requirements of the Securities Exchange Act of 1934, the Registrant has duly caused this report to be signed on its behalf by the undersigned hereunto duly authorized. ARGAN, INC. Date: October 30, 2025 By: /s/ Joshua S. Baugher Joshua S. Baugher Senior Vice President, Chief Financial Officer and Treasurer

View Full Filing

View this 8-K filing on SEC EDGAR

View on Read The Filing