Namib Minerals Updates Mine Technical Reports, Signaling Asset Focus
Ticker: NAMM · Form: 20-F · Filed: Apr 2, 2026 · CIK: 0002026514
| Field | Detail |
|---|---|
| Company | Namib Minerals (NAMM) |
| Form Type | 20-F |
| Filed Date | Apr 2, 2026 |
| Risk Level | medium |
| Pages | 15 |
| Reading Time | 18 min |
| Key Dollar Amounts | $0.0001, $11.50, $3.5 m |
| Sentiment | neutral |
Sentiment: neutral
Topics: Mining, 20-F, Mineral Exploration, Technical Reports, Resource Estimation, Zimbabwe Mining, Commodity Prices
Related Tickers: NAMM
TL;DR
**NAMM is doubling down on its mining assets; watch for resource upgrades and production guidance.**
AI Summary
Namib Minerals' 20-F filing for the period ending December 31, 2025, highlights its continued focus on mineral exploration and development, particularly with the inclusion of updated S-K 1300 Technical Report Summaries for its How Mine, Mazowe Mine, and Redwing Mine. While specific revenue and net income figures are not provided in the filing details, the emphasis on these technical reports suggests significant capital expenditures and operational planning in its mining assets. The filing includes a new technical report for the How Mine, effective December 31, 2025, indicating recent geological assessments and resource updates. Risks likely include commodity price volatility and operational challenges inherent in mining, as evidenced by the detailed technical reports which often precede or follow significant investment decisions. The strategic outlook appears centered on optimizing existing assets and potentially expanding resource definitions, with the Mazowe Mine's technical report effective December 31, 2023, and Redwing Mine's also effective December 31, 2023, suggesting ongoing evaluation of these properties. The company's commitment to regulatory compliance is demonstrated by the inclusion of multiple certifications (EX-12.1, EX-12.2, EX-13.1, EX-13.2) and consents from BDO South Africa Incorporated and WSP Australia Pty Limited.
Why It Matters
This filing provides crucial updates on Namib Minerals' core mining assets, including the How Mine, Mazowe Mine, and Redwing Mine, through new S-K 1300 Technical Report Summaries. For investors, these reports are vital for assessing the company's resource base, operational viability, and future production potential, directly impacting valuation. Employees and local communities around these mines will be affected by any operational changes or expansion plans detailed within these technical documents. In the broader market, these updates can influence commodity supply expectations and competitive dynamics within the mining sector, especially given the detailed geological and engineering data provided by WSP Australia Pty Limited.
Risk Assessment
Risk Level: medium — The risk level is medium due to the inherent volatility of the mining sector, including commodity price fluctuations and operational risks associated with developing and operating mines like How Mine, Mazowe Mine, and Redwing Mine. While the filing includes detailed technical reports, these reports themselves highlight the complexities and uncertainties in resource estimation and extraction, which can impact future profitability and cash flow.
Analyst Insight
Investors should scrutinize the S-K 1300 Technical Report Summaries for the How Mine, Mazowe Mine, and Redwing Mine to understand the updated resource estimates and economic viability. Look for specific production targets or cost projections that could impact future earnings and compare them against current commodity prices.
Key Numbers
- 2025-12-31 — Period of Report (The fiscal year-end covered by this 20-F filing for Namib Minerals.)
- 2026-04-02 — Filing Date (The date Namib Minerals submitted its 20-F to the SEC.)
- 340 — Number of Documents (Total documents included in the 0001213900-26-038838 filing, indicating comprehensive disclosure.)
- 4224000 — Size of Annual Report (iXBRL 20-F) (The substantial size of the main annual report document, suggesting detailed content.)
- 1574674 — Size of How Mine S-K 1300 Technical Report Summary (Indicates the depth of geological and engineering data provided for the How Mine.)
- 873719 — Size of Mazowe Mine S-K 1300 Technical Report Summary (Reflects the detailed assessment of the Mazowe Mine's resources and operations.)
- 942272 — Size of Redwing Mine S-K 1300 Technical Report Summary (Shows the extensive information available for the Redwing Mine.)
Key Players & Entities
- Namib Minerals (company) — filer of the 20-F report
- BDO South Africa Incorporated (company) — independent registered public accountant providing consent (EX-15.1)
- WSP Australia Pty Limited (company) — qualified person for the technical reports providing consent (EX-15.5)
- How Mine (company) — mining asset with an S-K 1300 Technical Report Summary effective December 31, 2025
- Mazowe Mine (company) — mining asset with an S-K 1300 Technical Report Summary effective December 31, 2023
- Redwing Mine (company) — mining asset with an S-K 1300 Technical Report Summary effective December 31, 2023
- SEC (regulator) — regulator receiving the 20-F filing
- December 31, 2025 (date) — period of report and effective date for How Mine technical report
- December 31, 2023 (date) — effective date for Mazowe Mine and Redwing Mine technical reports
FAQ
What are the key updates in Namib Minerals' 20-F filing for 2025?
The key updates in Namib Minerals' 20-F filing for the period ending December 31, 2025, include new S-K 1300 Technical Report Summaries for its How Mine, Mazowe Mine, and Redwing Mine. The How Mine report is effective December 31, 2025, while the Mazowe and Redwing Mine reports are effective December 31, 2023.
Which mines are covered by the S-K 1300 Technical Report Summaries in Namib Minerals' 20-F?
The S-K 1300 Technical Report Summaries in Namib Minerals' 20-F cover the How Mine, Mazowe Mine, and Redwing Mine. The How Mine report is the most recent, effective December 31, 2025.
Who provided consent for the technical reports in Namib Minerals' 20-F?
WSP Australia Pty Limited, identified as a Qualified Person for the technical reports, provided consent (EX-15.5) for the reports included in Namib Minerals' 20-F filing.
What is the significance of the December 31, 2025, effective date for the How Mine technical report?
The December 31, 2025, effective date for the How Mine technical report signifies that the geological and engineering data, resource estimates, and economic analysis for this specific mine are current as of the end of the reporting period, providing investors with up-to-date information.
What role does BDO South Africa Incorporated play in Namib Minerals' 20-F?
BDO South Africa Incorporated is the independent registered public accountant for Namib Minerals and provided their consent (EX-15.1) for the inclusion of their audit report in the 20-F filing, ensuring financial statement integrity.
How many documents are included in Namib Minerals' 20-F filing?
Namib Minerals' 20-F filing (SEC Accession No. 0001213900-26-038838) includes a total of 340 documents, indicating a comprehensive submission to the SEC.
What is the filing date for Namib Minerals' 20-F?
The filing date for Namib Minerals' 20-F was April 2, 2026, with acceptance on the same day at 06:45:14-04:00.
Are there any certifications included in Namib Minerals' 20-F?
Yes, Namib Minerals' 20-F includes multiple certifications, specifically EX-12.1, EX-12.2, EX-13.1, and EX-13.2, which are standard requirements for foreign private issuers to attest to the accuracy and completeness of their financial reports.
What does the inclusion of S-K 1300 Technical Report Summaries imply for Namib Minerals' strategy?
The inclusion of S-K 1300 Technical Report Summaries implies that Namib Minerals is actively assessing and disclosing the technical and economic viability of its mineral projects. This suggests a strategic focus on resource development, operational planning, and compliance with U.S. disclosure standards for mineral properties.
How can investors access the detailed technical reports for Namib Minerals' mines?
Investors can access the detailed technical reports for Namib Minerals' mines, such as the How Mine S-K 1300 Technical Report Summary (EX-15.2), through the SEC's EDGAR database by searching for Accession No. 0001213900-26-038838 and locating the specific exhibit documents.
Risk Factors
- Commodity Price Volatility [high — market]: The company's financial performance is inherently tied to the fluctuating prices of minerals. While specific commodity prices are not detailed in the provided filing summary, the inclusion of extensive S-K 1300 Technical Reports for How Mine, Mazowe Mine, and Redwing Mine suggests significant investment and operational planning that are sensitive to market price movements.
- Mining Operational Challenges [high — operational]: Mining operations are subject to inherent risks including geological uncertainties, equipment failures, labor issues, and environmental compliance. The detailed technical reports for How Mine (effective Dec 31, 2025), Mazowe Mine (effective Dec 31, 2023), and Redwing Mine (effective Dec 31, 2023) indicate ongoing assessments and potential challenges in resource extraction and operational efficiency.
- Regulatory Compliance and Reporting [medium — regulatory]: Namib Minerals demonstrates a commitment to regulatory compliance through the inclusion of various certifications (EX-12.1, EX-12.2, EX-13.1, EX-13.2) and consents from BDO South Africa Incorporated and WSP Australia Pty Limited. However, the complex and evolving nature of mining regulations in different jurisdictions presents an ongoing risk.
Industry Context
Namib Minerals operates within the global mining sector, which is characterized by significant capital intensity, cyclical commodity prices, and stringent environmental and social governance (ESG) regulations. The industry is increasingly focused on resource discovery, efficient extraction technologies, and sustainable mining practices. Companies like Namib Minerals must navigate volatile commodity markets and evolving regulatory landscapes to maintain profitability and investor confidence.
Regulatory Implications
The filing highlights Namib Minerals' adherence to SEC reporting requirements, including the provision of S-K 1300 compliant technical reports. Compliance with these regulations is critical for maintaining access to U.S. capital markets. Potential regulatory risks include changes in mining laws, environmental standards, and international trade policies affecting mineral commodities.
What Investors Should Do
- Review S-K 1300 Technical Reports
- Monitor Commodity Prices
- Assess Capital Expenditure Plans
Key Dates
- 2025-12-31: Period of Report End — Marks the end of the fiscal year for which the 20-F filing provides information, including updated technical reports.
- 2026-04-02: Filing Date — The date Namib Minerals submitted its annual report (20-F) to the SEC, indicating the availability of its latest financial and operational disclosures to investors.
- 2025-12-31: How Mine S-K 1300 Technical Report Effective Date — Indicates the most recent geological and resource assessment for the How Mine, crucial for understanding its current value and future potential.
- 2023-12-31: Mazowe Mine S-K 1300 Technical Report Effective Date — Represents the latest technical assessment of the Mazowe Mine's resources and operations, informing investment decisions.
- 2023-12-31: Redwing Mine S-K 1300 Technical Report Effective Date — Provides the most recent technical evaluation of the Redwing Mine, essential for assessing its operational status and resource base.
Glossary
- S-K 1300 Technical Report Summary
- A report prepared in accordance with SEC's Regulation S-K, Item 1300, which standardizes the reporting of mineral resources and reserves for mining companies. It provides detailed information on exploration, development, and production activities. (Crucial for investors to understand the company's mineral assets, their estimated quantities, qualities, and economic viability, as detailed for How Mine, Mazowe Mine, and Redwing Mine.)
- 20-F Filing
- An annual report required by the U.S. Securities and Exchange Commission (SEC) for foreign private issuers. It contains comprehensive financial and operational information about the company. (This is the primary document providing Namib Minerals' financial performance and operational overview for the fiscal year ending December 31, 2025.)
- iXBRL
- Inline eXtensible Business Reporting Language. It is a standard for the electronic tagging and reporting of financial data, making it easier for computers to read and analyze. (The main annual report document is in iXBRL format, indicating a move towards more machine-readable financial disclosures.)
Year-Over-Year Comparison
This filing, dated April 2, 2026, covers the period ending December 31, 2025. While specific comparative financial metrics like revenue and net income are not detailed in the provided summary, the inclusion of a new, updated S-K 1300 Technical Report for the How Mine (effective Dec 31, 2025) suggests significant recent activity and assessment of this key asset. The Mazowe and Redwing Mines' technical reports remain effective from December 31, 2023, indicating their evaluations are less recent compared to How Mine. The overall emphasis on detailed technical reporting points to a strategic focus on asset valuation and operational planning, potentially preceding or following significant investment decisions.
Filing Stats: 4,524 words · 18 min read · ~15 pages · Grade level 13.3 · Accepted 2026-04-02 06:45:14
Key Financial Figures
- $0.0001 — registered Ordinary shares, par value $0.0001 per share NAMM The Nasdaq Stock Market
- $11.50 — Ordinary Share at an exercise price of $11.50 per share NAMMW The Nasdaq Stock Market
- $3.5 m — December 9, 2025, with a face value of $3.5 million, issued by the Company to Cohen &
Filing Documents
- ea0280623-20f_namib.htm (20-F) — 4125KB
- ea028062301ex12-1.htm (EX-12.1) — 8KB
- ea028062301ex12-2.htm (EX-12.2) — 8KB
- ea028062301ex13-1.htm (EX-13.1) — 3KB
- ea028062301ex13-2.htm (EX-13.2) — 3KB
- ea028062301ex15-1.htm (EX-15.1) — 3KB
- ea028062301ex15-2.htm (EX-15.2) — 1538KB
- ea028062301ex15-3.htm (EX-15.3) — 853KB
- ea028062301ex15-4.htm (EX-15.4) — 920KB
- ea028062301ex15-5.htm (EX-15.5) — 7KB
- ea028062301_img1.jpg (GRAPHIC) — 10KB
- ea028062301_img2.jpg (GRAPHIC) — 12KB
- ea028062301_img3.jpg (GRAPHIC) — 29KB
- ea028062301_img4.jpg (GRAPHIC) — 40KB
- ea028062301_img5.jpg (GRAPHIC) — 38KB
- ea028062301_img6.jpg (GRAPHIC) — 38KB
- ea028062301_ex15-2img1.jpg (GRAPHIC) — 48KB
- ea028062301_ex15-2img2.jpg (GRAPHIC) — 4KB
- ea028062301_ex15-2img3.jpg (GRAPHIC) — 26KB
- ea028062301_ex15-2img4.jpg (GRAPHIC) — 37KB
- ea028062301_ex15-2img5.jpg (GRAPHIC) — 203KB
- ea028062301_ex15-2img6.jpg (GRAPHIC) — 294KB
- ea028062301_ex15-2img7.jpg (GRAPHIC) — 112KB
- ea028062301_ex15-2img8.jpg (GRAPHIC) — 79KB
- ea028062301_ex15-2img9.jpg (GRAPHIC) — 157KB
- ea028062301_ex15-2img10.jpg (GRAPHIC) — 106KB
- ea028062301_ex15-2img11.jpg (GRAPHIC) — 204KB
- ea028062301_ex15-2img12.jpg (GRAPHIC) — 321KB
- ea028062301_ex15-2img13.jpg (GRAPHIC) — 63KB
- ea028062301_ex15-2img14.jpg (GRAPHIC) — 112KB
- ea028062301_ex15-2img15.jpg (GRAPHIC) — 118KB
- ea028062301_ex15-2img16.jpg (GRAPHIC) — 157KB
- ea028062301_ex15-2img17.jpg (GRAPHIC) — 31KB
- ea028062301_ex15-2img18.jpg (GRAPHIC) — 28KB
- ea028062301_ex15-2img19.jpg (GRAPHIC) — 29KB
- ea028062301_ex15-2img20.jpg (GRAPHIC) — 33KB
- ea028062301_ex15-2img21.jpg (GRAPHIC) — 41KB
- ea028062301_ex15-2img22.jpg (GRAPHIC) — 52KB
- ea028062301_ex15-2img23.jpg (GRAPHIC) — 49KB
- ea028062301_ex15-2img24.jpg (GRAPHIC) — 52KB
- ea028062301_ex15-2img25.jpg (GRAPHIC) — 38KB
- ea028062301_ex15-2img26.jpg (GRAPHIC) — 108KB
- ea028062301_ex15-2img27.jpg (GRAPHIC) — 97KB
- ea028062301_ex15-2img28.jpg (GRAPHIC) — 54KB
- ea028062301_ex15-2img29.jpg (GRAPHIC) — 106KB
- ea028062301_ex15-2img30.jpg (GRAPHIC) — 108KB
- ea028062301_ex15-2img31.jpg (GRAPHIC) — 47KB
- ea028062301_ex15-2img32.jpg (GRAPHIC) — 197KB
- ea028062301_ex15-2img33.jpg (GRAPHIC) — 169KB
- ea028062301_ex15-2img34.jpg (GRAPHIC) — 98KB
- ea028062301_ex15-2img35.jpg (GRAPHIC) — 36KB
- ea028062301_ex15-2img36.jpg (GRAPHIC) — 39KB
- ea028062301_ex15-2img37.jpg (GRAPHIC) — 72KB
- ea028062301_ex15-2img38.jpg (GRAPHIC) — 65KB
- ea028062301_ex15-2img39.jpg (GRAPHIC) — 37KB
- ea028062301_ex15-2img40.jpg (GRAPHIC) — 37KB
- ea028062301_ex15-2img41.jpg (GRAPHIC) — 167KB
- ea028062301_ex15-2img42.jpg (GRAPHIC) — 36KB
- ea028062301_ex15-2img43.jpg (GRAPHIC) — 38KB
- ea028062301_ex15-2img44.jpg (GRAPHIC) — 77KB
- ea028062301_ex15-2img45.jpg (GRAPHIC) — 94KB
- ea028062301_ex15-2img46.jpg (GRAPHIC) — 96KB
- ea028062301_ex15-2img47.jpg (GRAPHIC) — 72KB
- ea028062301_ex15-2img48.jpg (GRAPHIC) — 149KB
- ea028062301_ex15-2img49.jpg (GRAPHIC) — 54KB
- ea028062301_ex15-2img50.jpg (GRAPHIC) — 75KB
- ea028062301_ex15-2img51.jpg (GRAPHIC) — 74KB
- ea028062301_ex15-2img52.jpg (GRAPHIC) — 81KB
- ea028062301_ex15-2img53.jpg (GRAPHIC) — 93KB
- ea028062301_ex15-2img54.jpg (GRAPHIC) — 127KB
- ea028062301_ex15-2img55.jpg (GRAPHIC) — 128KB
- ea028062301_ex15-2img56.jpg (GRAPHIC) — 134KB
- ea028062301_ex15-2img57.jpg (GRAPHIC) — 36KB
- ea028062301_ex15-2img58.jpg (GRAPHIC) — 39KB
- ea028062301_ex15-2img59.jpg (GRAPHIC) — 44KB
- ea028062301_ex15-2img60.jpg (GRAPHIC) — 38KB
- ea028062301_ex15-2img61.jpg (GRAPHIC) — 38KB
- ea028062301_ex15-2img62.jpg (GRAPHIC) — 58KB
- ea028062301_ex15-2img63.jpg (GRAPHIC) — 181KB
- ea028062301_ex15-2img64.jpg (GRAPHIC) — 129KB
- ea028062301_ex15-2img65.jpg (GRAPHIC) — 112KB
- ea028062301_ex15-2img66.jpg (GRAPHIC) — 115KB
- ea028062301_ex15-2img67.jpg (GRAPHIC) — 249KB
- ea028062301_ex15-2img68.jpg (GRAPHIC) — 127KB
- ea028062301_ex15-2img69.jpg (GRAPHIC) — 142KB
- ea028062301_ex15-2img70.jpg (GRAPHIC) — 105KB
- ea028062301_ex15-2img71.jpg (GRAPHIC) — 54KB
- ea028062301_ex15-2img72.jpg (GRAPHIC) — 43KB
- ea028062301_ex15-2img73.jpg (GRAPHIC) — 33KB
- ea028062301_ex15-2img74.jpg (GRAPHIC) — 51KB
- ea028062301_ex15-2img75.jpg (GRAPHIC) — 46KB
- ea028062301_ex15-2img76.jpg (GRAPHIC) — 35KB
- ea028062301_ex15-2img77.jpg (GRAPHIC) — 115KB
- ea028062301_ex15-2img78.jpg (GRAPHIC) — 37KB
- ea028062301_ex15-2img79.jpg (GRAPHIC) — 87KB
- ea028062301_ex15-2img80.jpg (GRAPHIC) — 116KB
- ea028062301_ex15-2img81.jpg (GRAPHIC) — 38KB
- ea028062301_ex15-2img82.jpg (GRAPHIC) — 56KB
- ea028062301_ex15-2img83.jpg (GRAPHIC) — 74KB
- ea028062301_ex15-2img84.jpg (GRAPHIC) — 220KB
- ea028062301_ex15-2img85.jpg (GRAPHIC) — 55KB
- ea028062301_ex15-2img86.jpg (GRAPHIC) — 104KB
- ea028062301_ex15-2img87.jpg (GRAPHIC) — 221KB
- ea028062301_ex15-2img88.jpg (GRAPHIC) — 100KB
- ea028062301_ex15-2img89.jpg (GRAPHIC) — 56KB
- ea028062301_ex15-2img90.jpg (GRAPHIC) — 108KB
- ea028062301_ex15-2img91.jpg (GRAPHIC) — 279KB
- ea028062301_ex15-2img92.jpg (GRAPHIC) — 53KB
- ea028062301_ex15-2img93.jpg (GRAPHIC) — 17KB
- ea028062301_ex15-2img94.jpg (GRAPHIC) — 19KB
- ea028062301_ex15-2img95.jpg (GRAPHIC) — 37KB
- ea028062301_ex15-2img96.jpg (GRAPHIC) — 58KB
- ea028062301_ex15-2img97.jpg (GRAPHIC) — 32KB
- ea028062301_ex15-2img98.jpg (GRAPHIC) — 29KB
- ea028062301_ex15-2img99.jpg (GRAPHIC) — 15KB
- ea028062301_ex15-2img100.jpg (GRAPHIC) — 34KB
- ea028062301_ex15-2img101.jpg (GRAPHIC) — 1KB
- ea028062301_ex15-3img1.jpg (GRAPHIC) — 71KB
- ea028062301_ex15-3img2.jpg (GRAPHIC) — 3KB
- ea028062301_ex15-3img3.jpg (GRAPHIC) — 13KB
- ea028062301_ex15-3img4.jpg (GRAPHIC) — 75KB
- ea028062301_ex15-3img5.jpg (GRAPHIC) — 96KB
- ea028062301_ex15-3img6.jpg (GRAPHIC) — 135KB
- ea028062301_ex15-3img7.jpg (GRAPHIC) — 75KB
- ea028062301_ex15-3img8.jpg (GRAPHIC) — 64KB
- ea028062301_ex15-3img9.jpg (GRAPHIC) — 164KB
- ea028062301_ex15-3img10.jpg (GRAPHIC) — 164KB
- ea028062301_ex15-3img11.jpg (GRAPHIC) — 57KB
- ea028062301_ex15-3img12.jpg (GRAPHIC) — 62KB
- ea028062301_ex15-3img13.jpg (GRAPHIC) — 127KB
- ea028062301_ex15-3img14.jpg (GRAPHIC) — 100KB
- ea028062301_ex15-3img15.jpg (GRAPHIC) — 104KB
- ea028062301_ex15-3img16.jpg (GRAPHIC) — 116KB
- ea028062301_ex15-3img17.jpg (GRAPHIC) — 34KB
- ea028062301_ex15-3img18.jpg (GRAPHIC) — 111KB
- ea028062301_ex15-3img19.jpg (GRAPHIC) — 104KB
- ea028062301_ex15-3img20.jpg (GRAPHIC) — 44KB
- ea028062301_ex15-3img21.jpg (GRAPHIC) — 56KB
- ea028062301_ex15-3img22.jpg (GRAPHIC) — 13KB
- ea028062301_ex15-3img23.jpg (GRAPHIC) — 7KB
- ea028062301_ex15-3img24.jpg (GRAPHIC) — 7KB
- ea028062301_ex15-3img25.jpg (GRAPHIC) — 40KB
- ea028062301_ex15-3img26.jpg (GRAPHIC) — 103KB
- ea028062301_ex15-3img27.jpg (GRAPHIC) — 80KB
- ea028062301_ex15-3img28.jpg (GRAPHIC) — 334KB
- ea028062301_ex15-3img29.jpg (GRAPHIC) — 38KB
- ea028062301_ex15-3img30.jpg (GRAPHIC) — 33KB
- ea028062301_ex15-3img31.jpg (GRAPHIC) — 70KB
- ea028062301_ex15-4img1.jpg (GRAPHIC) — 60KB
- ea028062301_ex15-4img2.jpg (GRAPHIC) — 2KB
- ea028062301_ex15-4img3.jpg (GRAPHIC) — 14KB
- ea028062301_ex15-4img4.jpg (GRAPHIC) — 42KB
- ea028062301_ex15-4img5.jpg (GRAPHIC) — 44KB
- ea028062301_ex15-4img6.jpg (GRAPHIC) — 64KB
- ea028062301_ex15-4img7.jpg (GRAPHIC) — 42KB
- ea028062301_ex15-4img8.jpg (GRAPHIC) — 30KB
- ea028062301_ex15-4img9.jpg (GRAPHIC) — 80KB
- ea028062301_ex15-4img10.jpg (GRAPHIC) — 29KB
- ea028062301_ex15-4img11.jpg (GRAPHIC) — 46KB
- ea028062301_ex15-4img12.jpg (GRAPHIC) — 39KB
- ea028062301_ex15-4img13.jpg (GRAPHIC) — 25KB
- ea028062301_ex15-4img14.jpg (GRAPHIC) — 26KB
- ea028062301_ex15-4img15.jpg (GRAPHIC) — 45KB
- ea028062301_ex15-4img16.jpg (GRAPHIC) — 55KB
- ea028062301_ex15-4img17.jpg (GRAPHIC) — 62KB
- ea028062301_ex15-4img18.jpg (GRAPHIC) — 36KB
- ea028062301_ex15-4img19.jpg (GRAPHIC) — 41KB
- ea028062301_ex15-4img20.jpg (GRAPHIC) — 8KB
- ea028062301_ex15-4img21.jpg (GRAPHIC) — 41KB
- ea028062301_ex15-4img22.jpg (GRAPHIC) — 27KB
- ea028062301_ex15-4img23.jpg (GRAPHIC) — 17KB
- ea028062301_ex15-4img24.jpg (GRAPHIC) — 17KB
- ea028062301_ex15-4img25.jpg (GRAPHIC) — 17KB
- ea028062301_ex15-5img1.jpg (GRAPHIC) — 2KB
- 0001213900-26-038838.txt ( ) — 37504KB
- namm-20251231.xsd (EX-101.SCH) — 190KB
- namm-20251231_cal.xml (EX-101.CAL) — 97KB
- namm-20251231_def.xml (EX-101.DEF) — 615KB
- namm-20251231_lab.xml (EX-101.LAB) — 1068KB
- namm-20251231_pre.xml (EX-101.PRE) — 630KB
- ea0280623-20f_namib_htm.xml (XML) — 3084KB
IDENTITY OF DIRECTORS, SENIOR MANAGEMENT AND ADVISERS
ITEM 1. IDENTITY OF DIRECTORS, SENIOR MANAGEMENT AND ADVISERS 1
OFFER STATISTICS AND EXPECTED TIMETABLE
ITEM 2. OFFER STATISTICS AND EXPECTED TIMETABLE 1
KEY INFORMATION
ITEM 3. KEY INFORMATION 1
INFORMATION ON THE COMPANY
ITEM 4. INFORMATION ON THE COMPANY 35
UNRESOLVED STAFF COMMENTS
ITEM 4A. UNRESOLVED STAFF COMMENTS 72
OPERATING AND FINANCIAL REVIEW AND PROSPECTS
ITEM 5. OPERATING AND FINANCIAL REVIEW AND PROSPECTS 72
DIRECTORS, SENIOR MANAGEMENT AND EMPLOYEES
ITEM 6. DIRECTORS, SENIOR MANAGEMENT AND EMPLOYEES 91
MAJOR SHAREHOLDERS AND RELATED PARTY TRANSACTIONS
ITEM 7. MAJOR SHAREHOLDERS AND RELATED PARTY TRANSACTIONS 97
FINANCIAL INFORMATION
ITEM 8. FINANCIAL INFORMATION 103
THE OFFER AND LISTING
ITEM 9. THE OFFER AND LISTING 103
ADDITIONAL INFORMATION
ITEM 10. ADDITIONAL INFORMATION 104
QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISKS
ITEM 11. QUANTITATIVE AND QUALITATIVE DISCLOSURES ABOUT MARKET RISKS 119
DESCRIPTION OF SECURITIES OTHER THAN EQUITY SECURITIES
ITEM 12. DESCRIPTION OF SECURITIES OTHER THAN EQUITY SECURITIES 119 PART II 125 PART III 129
FINANCIAL STATEMENTS
ITEM 17. FINANCIAL STATEMENTS 129
FINANCIAL STATEMENTS
ITEM 18. FINANCIAL STATEMENTS 129
EXHIBITS
ITEM 19. EXHIBITS 129 i FREQUENTLY USED TERMS Mining Terms "Assay" means chemical test performed on a sample of ores or minerals to determine the amount of valuable metals contained. "BIF" means Banded Iron Formation. "Carbon-in-plant" or "CIP" means gold is leached conventionally from a slurry of gold ore with cyanide in agitated tanks. The leached slurry passes into the CIP circuit where carbon granules are mixed with the slurry and gold is absorbed onto the carbon. The carbon granules are separated from the slurry and treated to remove gold. "Care and maintenance" means the processes and conditions on a closed mine site where there is potential to recommence operations at a later date. "Concentrate" means a clean product which has been upgraded sufficiently for downstream processing or sale. "Contained gold" means the total gold or copper content (tons multiplied by grade) of the material being described. "Cut-off grade" or "COG" means the grade (i.e., the concentration of metal or mineral in rock) that determines the destination of the material during mining. For purposes of establishing "prospects of economic extraction," the cut-off grade is the grade that distinguishes material deemed to have no economic value (it will not be mined in underground mining or if mined in surface mining, its destination will be the waste dump) from material deemed to have economic value (its ultimate destination during mining will be a processing facility). Other terms used in similar fashion as cut-off grade include net smelter return, pay limit, and break-even stripping ratio. "Cyanidation" means a method of extracting exposed gold grains from crushed or ground ore by dissolving it in a weak cyanide solution. May be carried out in tanks inside a mill or in heaps of ore out of doors. "Decline" means an inclined underground access way. "Deposit" means an informal term for an accumulation of mineralization or other valuable earth material of any origin.