Ero Copper Corp. Files 6-K, Incorporates Press Release
Ticker: ERO · Form: 6-K · Filed: 2024-10-07T00:00:00.000Z
Sentiment: neutral
Topics: disclosure, filing, press-release
Related Tickers: ERO
TL;DR
Ero Copper (ERO) filed a 6-K on Oct 7th, referencing a press release from Oct 6th. Check for updates.
AI Summary
Ero Copper Corp. filed a Form 6-K on October 7, 2024, to report information for the month of October 2024. The filing incorporates by reference a press release dated October 6, 2024, as Exhibit 99.1. This exhibit is also being incorporated into their existing Registration Statements on Form S-8 (File NO. 333-264821) and Form F-10 (File NO. 333-274097).
Why It Matters
This filing indicates that Ero Copper Corp. is providing updated information to the SEC, likely related to ongoing business activities or disclosures mentioned in the October 6th press release.
Risk Assessment
Risk Level: low — This is a routine filing (6-K) that incorporates a press release, indicating standard disclosure practices rather than a material event.
Key Numbers
- 001-40459 — Commission File Number (Identifies Ero Copper Corp.'s filing with the SEC.)
Key Players & Entities
- Ero Copper Corp. (company) — Registrant
- 001-40459 (dollar_amount) — Commission File Number
- 333-264821 (dollar_amount) — Registration Statement on Form S-8 File Number
- 333-274097 (dollar_amount) — Registration Statement on Form F-10 File Number
- October 6, 2024 (date) — Date of Press Release
- October 7, 2024 (date) — Filing Date
FAQ
What is the subject of the press release dated October 6, 2024?
The filing does not disclose the specific content of the press release dated October 6, 2024, only that it is attached as Exhibit 99.1 and incorporated by reference.
What is the purpose of incorporating Exhibit 99.1 into the Registration Statements?
Exhibit 99.1, the press release dated October 6, 2024, is incorporated by reference into the registrant's Registration Statements on Form S-8 (File NO. 333-264821) and Form F-10 (File NO. 333-274097).
What is the filing date of this Form 6-K?
This Form 6-K was filed as of October 7, 2024.
What is Ero Copper Corp.'s principal executive office address?
Ero Copper Corp.'s principal executive office is located at 625 Howe Street, Suite 1050, Vancouver, British Columbia V6C 2T6, Canada.
Does Ero Copper Corp. file annual reports under Form 20-F or Form 40-F?
Ero Copper Corp. indicates it files annual reports under Form 40-F.
From the Filing
0001171843-24-005531.txt : 20241007 0001171843-24-005531.hdr.sgml : 20241007 20241007060558 ACCESSION NUMBER: 0001171843-24-005531 CONFORMED SUBMISSION TYPE: 6-K PUBLIC DOCUMENT COUNT: 2 CONFORMED PERIOD OF REPORT: 20241006 FILED AS OF DATE: 20241007 DATE AS OF CHANGE: 20241007 FILER: COMPANY DATA: COMPANY CONFORMED NAME: Ero Copper Corp. CENTRAL INDEX KEY: 0001853860 STANDARD INDUSTRIAL CLASSIFICATION: METAL MINING [1000] ORGANIZATION NAME: 01 Energy & Transportation IRS NUMBER: 000000000 STATE OF INCORPORATION: A1 FISCAL YEAR END: 1231 FILING VALUES: FORM TYPE: 6-K SEC ACT: 1934 Act SEC FILE NUMBER: 001-40459 FILM NUMBER: 241356036 BUSINESS ADDRESS: STREET 1: 625 HOWE STREET, SUITE 1050 CITY: VANCOUVER STATE: A1 ZIP: V6C 2T6 BUSINESS PHONE: 604-449-9236 MAIL ADDRESS: STREET 1: 625 HOWE STREET, SUITE 1050 CITY: VANCOUVER STATE: A1 ZIP: V6C 2T6 6-K 1 f6k_100724.htm FORM 6-K   UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 6-K Report of Foreign Private Issuer Pursuant to Rule 13a-16 or 15d-16 under the Securities Exchange Act of 1934   For the month of October 2024   Commission File Number: 001-40459 Ero Copper Corp. (Translation of registrant's name into English)   625 Howe Street, Suite 1050 Vancouver, British Columbia V6C 2T6 Canada (Address of principal executive office) Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F: Form 20-F [   ]      Form 40-F [ X ] Exhibit 99.1 of this Form 6-K is incorporated by reference as an additional exhibit to the registrant’s Registration Statement on Form S-8 (File NO. 333-264821) and Registration Statement on Form F-10 (File NO. 333-274097). On October 6, 2024, the Registrant issued a press release, a copy of which is attached hereto as Exhibit 99.1 and is incorporated herein by reference. (c) Exhibit 99.1. Press release dated October 6, 2024 --> Signatures Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.       Ero Copper Corp.         Date: October 6, 2024  By: /s/ Deepk Hundal         Name: Deepk Hundal     Title: SVP, General Counsel and Corporate Secretary     EXHIBIT INDEX   Exhibit Number   Description       99.1   Press Release dated October 6, 2024 EX-99.1 2 exh_991.htm PRESS RELEASE EdgarFiling EXHIBIT 99.1 Ero Copper Reports Temporary Power Disruption at the Tucumã Operation Following Severe Windstorm VANCOUVER, British Columbia, Oct. 06, 2024 (GLOBE NEWSWIRE) -- Ero Copper Corp. (TSX: ERO, NYSE: ERO) ("Ero" or the “Company”) announces that its Tucumã Operation has experienced a temporary power disruption following a severe localized windstorm that occurred in the southwest region of the Carajás Mineral Province in Pará State, Brazil on October 5, 2024. The Company's workforce is safe, and there has been no damage to infrastructure at the Tucumã Operation. The regional power grid, including the main 230kV transmission line servicing the region, sustained damage during the storm, resulting in a loss of power to more than 200,000 residents as well as major industrial users. Power has since been fully restored to residential communities and partially restored to industrial consumers. The owner and operator of the transmission line has advised that full power restoration to industrial consumers, including the Company's Tucumã Operation, is expected within two weeks. The power disruption at Tucumã has impacted the milling, flotation and filtration circuits within the processing plant. Mining and crushing operations remain unaffected, with ore continuing to be placed on the run-of-mine and crushed ore stockpiles. Th