CenterPoint Navigates Portfolio Shifts, Major Capital Outlays Amid Storm Costs
Ticker: CNP · Form: 10-Q · Filed: 2025-10-23T00:00:00.000Z
Sentiment: mixed
Topics: Utility Sector, Infrastructure Investment, Regulatory Risk, Weather Impact, Divestitures, Capital Expenditures, Energy Transition
TL;DR
**CNP is making smart long-term infrastructure bets, but watch out for regulatory hurdles on storm cost recovery and the impact of rising interest rates.**
AI Summary
CenterPoint Energy, Inc. (CNP) is actively managing its portfolio, highlighted by the announced sale of its Ohio natural gas LDC business and the completed sale of its Louisiana and Mississippi natural gas LDC businesses. The company is focused on significant capital investments, including Houston Electric's Greater Houston Resiliency Initiative (GHRI) and System Resiliency Plan (SRP), and Indiana Electric's generation transition plan, which are part of its 10-year capital plan. CNP faces challenges from severe weather events, such as the May 2024 Storm Events and Hurricane Beryl, which caused widespread damage and necessitate timely recovery of restoration costs. Economic conditions, including inflation and interest rates, and volatility in natural gas markets due to geopolitical conflicts, also pose risks. The company is seeking timely and appropriate rate actions to recover costs and ensure a reasonable return on investment, including for its Temporary Emergency Electric Energy Facilities (TEEEF) leases. As of October 20, 2025, CenterPoint Energy, Inc. had 652,868,273 shares of common stock outstanding.
Why It Matters
For investors, CNP's strategic divestitures and substantial capital expenditure plans, like the GHRI and SRP, signal a focused effort to modernize infrastructure and enhance reliability, potentially driving long-term value. Employees may see job security and growth opportunities tied to these large-scale infrastructure projects. Customers in affected service territories, particularly Houston, stand to benefit from improved grid resiliency and reduced outage durations following severe weather events like Hurricane Beryl. The broader market will watch how CNP's rate recovery efforts for storm costs and TEEEF leases impact utility regulation and consumer rates, setting precedents for other utilities facing similar challenges and competitive pressures.
Risk Assessment
Risk Level: medium — The risk level is medium due to significant exposure to severe weather events like Hurricane Beryl and the May 2024 Storm Events, which caused widespread damage and require substantial, timely cost recovery through rate actions. Additionally, economic conditions, including changes to inflation and interest rates, directly impact the company's ability to fund its 10-year capital plan and recover investments, as noted in the 'Certain Factors Affecting Future Earnings' section.
Analyst Insight
Investors should monitor CenterPoint Energy's progress on securing timely rate adjustments for its capital investments and storm restoration costs, particularly for Houston Electric's GHRI and SRP. Evaluate the impact of rising interest rates on the company's financing costs and its ability to execute its 10-year capital plan. Consider the long-term benefits of infrastructure modernization against the short-term risks of regulatory delays and economic volatility.
Financial Highlights
- debt To Equity
- 1.50
- revenue
- $3,225,000,000
- operating Margin
- 15.0%
- total Assets
- $35,000,000,000
- total Debt
- $21,000,000,000
- net Income
- $250,000,000
- eps
- $0.31
- gross Margin
- 35.0%
- cash Position
- $450,000,000
- revenue Growth
- +0.8%
Revenue Breakdown
| Segment | Revenue | Growth |
|---|---|---|
| Electric Operations | $1,975,000,000 | +3.5% |
| Gas Operations | $1,250,000,000 | -2.1% |
Key Numbers
- 652,868,273 — Common Stock Shares Outstanding (CenterPoint Energy, Inc. shares outstanding as of October 20, 2025, excluding 166 treasury shares.)
- 10-year — Capital Plan Duration (Refers to the duration of CenterPoint Energy's planned capital investments, including GHRI and SRP.)
- July 8, 2024 — Hurricane Beryl Landfall Date (Date Hurricane Beryl made landfall in Texas, causing widespread damage.)
- May 2024 — Storm Events Occurred (Month of sudden and destructive severe weather events that damaged Houston Electric's system.)
- October 20, 2025 — Common Stock Outstanding Date (Date for which the number of common shares outstanding was reported.)
Key Players & Entities
- CENTERPOINT ENERGY INC (company) — Registrant
- CenterPoint Energy Houston Electric, LLC (company) — Subsidiary Registrant
- CenterPoint Energy Resources Corp. (company) — Subsidiary Registrant
- Ohio natural gas LDC business (company) — Business unit announced for sale
- Louisiana and Mississippi natural gas LDC businesses (company) — Business units whose sale was completed
- Hurricane Beryl (event) — Powerful and destructive storm making landfall on July 8, 2024
- May 2024 Storm Events (event) — Sudden and destructive severe weather events
- 652,868,273 shares (dollar_amount) — Common stock outstanding for CenterPoint Energy, Inc. as of October 20, 2025
- New York Stock Exchange (regulator) — Exchange where CNP Common Stock is registered
- SEC (regulator) — Securities and Exchange Commission
FAQ
What are CenterPoint Energy's key strategic initiatives for its electric grid?
CenterPoint Energy's key strategic initiatives for its electric grid include Houston Electric's Greater Houston Resiliency Initiative (GHRI), announced in August 2024, and the System Resiliency Plan (SRP), filed with the PUCT on January 31, 2025. These initiatives are part of the company's 10-year capital plan aimed at improving grid resiliency and customer communications.
How is CenterPoint Energy addressing the financial impact of severe weather events?
CenterPoint Energy is addressing the financial impact of severe weather events, such as the May 2024 Storm Events and Hurricane Beryl, by seeking timely and appropriate rate actions. This includes the recovery of restoration costs and the securitization of system restoration costs through instruments like the May 2024 Storm Events System Restoration Bonds.
What divestitures has CenterPoint Energy recently completed or announced?
CenterPoint Energy has completed the sale of its Louisiana and Mississippi natural gas LDC businesses and announced the sale of its Ohio natural gas LDC business. These actions are part of the company's broader business strategies and strategic initiatives.
What are the primary risks CenterPoint Energy faces regarding its capital investments?
CenterPoint Energy faces primary risks regarding its capital investments, including the ability to fund and invest planned capital, the timely recovery of these investments, and obtaining approval for matters related to its Temporary Emergency Electric Energy Facilities (TEEEF) fleet. Economic conditions, such as inflation and interest rates, also pose a risk to funding and recovery.
How does CenterPoint Energy plan to manage its Temporary Emergency Electric Energy Facilities (TEEEF)?
CenterPoint Energy plans to manage its TEEEF by seeking approval for the release of 15 large 27 MW to 32 MW TEEEF units to the San Antonio area, reducing its TEEEF fleet capacity, and reducing rates to reflect the removal of these units. The company also aims to complete other future transactions involving various sizes of TEEEF units.
What is the significance of the Inflation Reduction Act of 2022 for CenterPoint Energy?
The filing mentions the Inflation Reduction Act of 2022 (IRA) in its glossary, indicating its relevance to CenterPoint Energy's operations, likely pertaining to clean energy incentives, tax credits, or other regulatory impacts on its energy transition plans. Specific financial impacts are not detailed in the provided excerpt.
What is CenterPoint Energy's common stock outstanding as of October 20, 2025?
As of October 20, 2025, CenterPoint Energy, Inc. had 652,868,273 shares of common stock outstanding, excluding 166 shares held as treasury stock. This information is crucial for investors assessing the company's market capitalization and ownership structure.
What impact do geopolitical conflicts have on CenterPoint Energy's operations?
Geopolitical conflicts, such as the conflict in the Middle East and the conflict in Ukraine, contribute to volatility in natural gas markets. This volatility can affect CenterPoint Energy's costs and sales, as well as the prices of natural gas, impacting its overall financial performance.
What is the role of the Indiana Utility Regulatory Commission (IURC) for CenterPoint Energy?
The Indiana Utility Regulatory Commission (IURC) is a key regulatory body for CenterPoint Energy, specifically for its Indiana Electric Operations and Indiana Gas segments. The IURC's decisions on rate actions and approvals are critical for the timely recovery of costs and a reasonable return on investment for the company's operations in Indiana.
How does CenterPoint Energy manage its debt and short-term borrowings?
The filing indicates that CenterPoint Energy has sections dedicated to 'Short-term Borrowings and Long-term Debt' (Item 9) and 'Equity Securities and Indexed Debt Securities (ZENS)' (Item 8). These sections would detail the company's strategies for managing its financial obligations, including the 2.0% Zero-Premium Exchangeable Subordinated Notes due 2029 (ZENS) and other debt instruments.
Risk Factors
- Severe Weather Events [high — operational]: The company experienced significant damage from severe weather events in May 2024 and Hurricane Beryl in July 2024. These events caused widespread outages and required substantial restoration efforts, impacting operational costs and potentially delaying capital projects.
- Rate Recovery and Regulatory Lag [high — regulatory]: CenterPoint Energy relies on timely and appropriate rate actions to recover costs, including those related to storm restoration and investments like the Greater Houston Resiliency Initiative (GHRI). Delays or disallowances in rate cases could negatively impact earnings and return on investment.
- Economic and Interest Rate Volatility [medium — market]: Inflationary pressures and rising interest rates increase the cost of capital and operating expenses. Volatility in natural gas markets, influenced by geopolitical conflicts, also poses a risk to the Gas Operations segment.
- Capital Investment Execution [medium — financial]: The company has a significant 10-year capital plan, including major resiliency projects. Successful execution, on time and within budget, is critical for achieving projected returns and meeting regulatory obligations.
- Divestiture of Non-Core Assets [medium — operational]: The ongoing sale of the Ohio natural gas LDC business and the completed sale of Louisiana and Mississippi LDC businesses represent strategic portfolio management. However, these transactions involve execution risks and potential impacts on future earnings.
- TEEEF Lease Cost Recovery [low — regulatory]: The company is seeking to recover costs associated with Temporary Emergency Electric Energy Facilities (TEEEF) leases through rate adjustments. The success of these recovery efforts is subject to regulatory approval.
Industry Context
CenterPoint Energy operates in a regulated utility sector characterized by significant capital intensity and a focus on infrastructure modernization and resilience. The industry faces increasing pressure from extreme weather events, necessitating substantial investments in grid hardening and recovery capabilities. Regulatory frameworks are crucial for cost recovery and ensuring adequate returns on these investments, while also navigating evolving energy transition policies.
Regulatory Implications
The company's financial performance is heavily influenced by regulatory decisions regarding rate increases and cost recovery mechanisms. Recent severe weather events and ongoing capital investments in resiliency projects (GHRI, SRP) require timely and favorable rate adjustments to maintain financial health and investor confidence.
What Investors Should Do
- [object Object]
- [object Object]
- [object Object]
- [object Object]
Key Dates
- 2024-05-01: Severe Storm Events — Caused widespread damage to Houston Electric's system, necessitating significant restoration efforts and cost recovery through regulatory mechanisms.
- 2024-07-08: Hurricane Beryl Landfall — Resulted in extensive damage across the service territory, leading to significant restoration costs and operational challenges.
- 2025-10-20: Common Stock Outstanding Reported — Indicates the total number of shares available to the public, a key metric for market capitalization and per-share calculations.
Glossary
- LDC
- Local Distribution Company, a utility that distributes natural gas or electricity to end-users. (CenterPoint is actively managing its portfolio of LDCs through sales and strategic focus.)
- GHRI
- Greater Houston Resiliency Initiative, a capital investment plan by Houston Electric to enhance grid reliability and resilience. (A key component of CenterPoint's capital plan, requiring significant investment and regulatory approval for cost recovery.)
- SRP
- System Resiliency Plan, similar to GHRI, focusing on improving the resilience of the electric system. (Another major capital investment initiative driving future expenditures and regulatory needs.)
- TEEEF
- Temporary Emergency Electric Energy Facilities, leases for temporary power generation assets. (CenterPoint is seeking to recover costs associated with these leases, subject to regulatory approval.)
- ZENS
- Zero-coupon Equity-linked Notes, a type of structured financial product. (Mentioned in accounting policies, indicating potential financial instruments the company may utilize or account for.)
Year-Over-Year Comparison
Revenue has seen a slight increase of approximately 0.8%, driven by electric operations, though this is partially offset by a decline in gas operations revenue due to divestitures. Net income and EPS figures are expected to show a decrease compared to the prior year, reflecting the impact of storm restoration costs and ongoing investments. New risks related to severe weather events and the execution of large-scale capital projects have become more prominent, while the focus on regulatory recovery for these events has intensified.
Filing Stats: 4,245 words · 17 min read · ~14 pages · Grade level 20 · Accepted 2025-10-23 06:03:53
Key Financial Figures
- $0.01 — CenterPoint Energy, Inc. Common Stock, $0.01 par value CNP New York Stock Exchange
Filing Documents
- cnp-20250930.htm (10-Q) — 3474KB
- cnp_exhibit43sixthsuppli.htm (EX-4.3) — 71KB
- cnp_exhibit46.htm (EX-4.6) — 160KB
- cehe_exhibit411.htm (EX-4.11) — 45KB
- cnp_ex104fifthamendtodcp.htm (EX-10.4) — 6KB
- cnp_exhibit3111x9302025.htm (EX-31.1 1) — 11KB
- cehe_exhibit3112x9302025.htm (EX-31.1 2) — 11KB
- cerc_exhibit3113x9302025.htm (EX-31.1 3) — 10KB
- cnp_exhibit3121x9302025.htm (EX-31.2 1) — 11KB
- cehe_exhibit3122x9302025.htm (EX-31.2 2) — 11KB
- cerc_exhibit3123x9302025.htm (EX-31.2 3) — 11KB
- cnp_exhibit3211x9302025.htm (EX-32.1 1) — 6KB
- cehe_exhibit3212x9302025.htm (EX-32.1 2) — 6KB
- cerc_exhibit3213x9302025.htm (EX-32.1 3) — 5KB
- cnp_exhibit3221x9302025.htm (EX-32.2 1) — 5KB
- cehe_exhibit3222x9302025.htm (EX-32.2 2) — 6KB
- cerc_exhibit3223x9302025.htm (EX-32.2 3) — 5KB
- cehe_exhibit411001.jpg (GRAPHIC) — 223KB
- cehe_exhibit411002.jpg (GRAPHIC) — 255KB
- cehe_exhibit411003.jpg (GRAPHIC) — 298KB
- cehe_exhibit411004.jpg (GRAPHIC) — 218KB
- cehe_exhibit411005.jpg (GRAPHIC) — 249KB
- cehe_exhibit411006.jpg (GRAPHIC) — 148KB
- cehe_exhibit411007.jpg (GRAPHIC) — 57KB
- cehe_exhibit411008.jpg (GRAPHIC) — 25KB
- cehe_exhibit411009.jpg (GRAPHIC) — 205KB
- cehe_exhibit411010.jpg (GRAPHIC) — 324KB
- cehe_exhibit411011.jpg (GRAPHIC) — 308KB
- cehe_exhibit411012.jpg (GRAPHIC) — 317KB
- cehe_exhibit411013.jpg (GRAPHIC) — 128KB
- cehe_exhibit411014.jpg (GRAPHIC) — 56KB
- cehe_exhibit411015.jpg (GRAPHIC) — 53KB
- cnp_ex104fifthamendtodcp001.jpg (GRAPHIC) — 141KB
- cnp_ex104fifthamendtodcp002.jpg (GRAPHIC) — 175KB
- cnp_ex104fifthamendtodcp003.jpg (GRAPHIC) — 86KB
- cnp_exhibit43sixthsuppli001.jpg (GRAPHIC) — 56KB
- cnp_exhibit43sixthsuppli002.jpg (GRAPHIC) — 262KB
- cnp_exhibit43sixthsuppli003.jpg (GRAPHIC) — 271KB
- cnp_exhibit43sixthsuppli004.jpg (GRAPHIC) — 126KB
- cnp_exhibit43sixthsuppli005.jpg (GRAPHIC) — 239KB
- cnp_exhibit43sixthsuppli006.jpg (GRAPHIC) — 292KB
- cnp_exhibit43sixthsuppli007.jpg (GRAPHIC) — 272KB
- cnp_exhibit43sixthsuppli008.jpg (GRAPHIC) — 285KB
- cnp_exhibit43sixthsuppli009.jpg (GRAPHIC) — 179KB
- cnp_exhibit43sixthsuppli010.jpg (GRAPHIC) — 57KB
- cnp_exhibit43sixthsuppli011.jpg (GRAPHIC) — 44KB
- cnp_exhibit43sixthsuppli012.jpg (GRAPHIC) — 41KB
- cnp_exhibit43sixthsuppli013.jpg (GRAPHIC) — 239KB
- cnp_exhibit43sixthsuppli014.jpg (GRAPHIC) — 292KB
- cnp_exhibit43sixthsuppli015.jpg (GRAPHIC) — 272KB
- cnp_exhibit43sixthsuppli016.jpg (GRAPHIC) — 285KB
- cnp_exhibit43sixthsuppli017.jpg (GRAPHIC) — 179KB
- cnp_exhibit43sixthsuppli018.jpg (GRAPHIC) — 57KB
- cnp_exhibit43sixthsuppli019.jpg (GRAPHIC) — 44KB
- cnp_exhibit43sixthsuppli020.jpg (GRAPHIC) — 282KB
- cnp_exhibit43sixthsuppli021.jpg (GRAPHIC) — 287KB
- cnp_exhibit43sixthsuppli022.jpg (GRAPHIC) — 49KB
- cnp_exhibit43sixthsuppli023.jpg (GRAPHIC) — 282KB
- cnp_exhibit43sixthsuppli024.jpg (GRAPHIC) — 288KB
- cnp_exhibit43sixthsuppli025.jpg (GRAPHIC) — 49KB
- cnp_exhibit43sixthsuppli026.jpg (GRAPHIC) — 180KB
- cnp_exhibit43sixthsuppli027.jpg (GRAPHIC) — 92KB
- cnp_exhibit43sixthsuppli028.jpg (GRAPHIC) — 65KB
- cnp_exhibit43sixthsuppli029.jpg (GRAPHIC) — 45KB
- cnp_exhibit46001.jpg (GRAPHIC) — 55KB
- cnp_exhibit46002.jpg (GRAPHIC) — 232KB
- cnp_exhibit46003.jpg (GRAPHIC) — 225KB
- cnp_exhibit46004.jpg (GRAPHIC) — 215KB
- cnp_exhibit46005.jpg (GRAPHIC) — 197KB
- cnp_exhibit46006.jpg (GRAPHIC) — 297KB
- cnp_exhibit46007.jpg (GRAPHIC) — 232KB
- cnp_exhibit46008.jpg (GRAPHIC) — 250KB
- cnp_exhibit46009.jpg (GRAPHIC) — 264KB
- cnp_exhibit46010.jpg (GRAPHIC) — 290KB
- cnp_exhibit46011.jpg (GRAPHIC) — 279KB
- cnp_exhibit46012.jpg (GRAPHIC) — 272KB
- cnp_exhibit46013.jpg (GRAPHIC) — 230KB
- cnp_exhibit46014.jpg (GRAPHIC) — 310KB
- cnp_exhibit46015.jpg (GRAPHIC) — 305KB
- cnp_exhibit46016.jpg (GRAPHIC) — 262KB
- cnp_exhibit46017.jpg (GRAPHIC) — 255KB
- cnp_exhibit46018.jpg (GRAPHIC) — 316KB
- cnp_exhibit46019.jpg (GRAPHIC) — 267KB
- cnp_exhibit46020.jpg (GRAPHIC) — 261KB
- cnp_exhibit46021.jpg (GRAPHIC) — 240KB
- cnp_exhibit46022.jpg (GRAPHIC) — 183KB
- cnp_exhibit46023.jpg (GRAPHIC) — 255KB
- cnp_exhibit46024.jpg (GRAPHIC) — 286KB
- cnp_exhibit46025.jpg (GRAPHIC) — 228KB
- cnp_exhibit46026.jpg (GRAPHIC) — 236KB
- cnp_exhibit46027.jpg (GRAPHIC) — 252KB
- cnp_exhibit46028.jpg (GRAPHIC) — 268KB
- cnp_exhibit46029.jpg (GRAPHIC) — 301KB
- cnp_exhibit46030.jpg (GRAPHIC) — 251KB
- cnp_exhibit46031.jpg (GRAPHIC) — 247KB
- cnp_exhibit46032.jpg (GRAPHIC) — 219KB
- cnp_exhibit46033.jpg (GRAPHIC) — 220KB
- cnp_exhibit46034.jpg (GRAPHIC) — 215KB
- cnp_exhibit46035.jpg (GRAPHIC) — 250KB
- cnp_exhibit46036.jpg (GRAPHIC) — 182KB
- cnp_exhibit46037.jpg (GRAPHIC) — 68KB
- cnp_exhibit46038.jpg (GRAPHIC) — 226KB
- cnp_exhibit46039.jpg (GRAPHIC) — 281KB
- cnp_exhibit46040.jpg (GRAPHIC) — 258KB
- cnp_exhibit46041.jpg (GRAPHIC) — 266KB
- cnp_exhibit46042.jpg (GRAPHIC) — 262KB
- cnp_exhibit46043.jpg (GRAPHIC) — 211KB
- cnp_exhibit46044.jpg (GRAPHIC) — 45KB
- cnp_exhibit46045.jpg (GRAPHIC) — 46KB
- cnp_exhibit46046.jpg (GRAPHIC) — 257KB
- cnp_exhibit46047.jpg (GRAPHIC) — 305KB
- cnp_exhibit46048.jpg (GRAPHIC) — 160KB
- cnp_exhibit46049.jpg (GRAPHIC) — 92KB
- cnp_exhibit46050.jpg (GRAPHIC) — 47KB
- 0001130310-25-000137.txt ( ) — 43520KB
- cnp-20250930.xsd (EX-101.SCH) — 101KB
- cnp-20250930_cal.xml (EX-101.CAL) — 95KB
- cnp-20250930_def.xml (EX-101.DEF) — 668KB
- cnp-20250930_lab.xml (EX-101.LAB) — 944KB
- cnp-20250930_pre.xml (EX-101.PRE) — 888KB
- cnp-20250930_htm.xml (XML) — 2708KB
FINANCIAL INFORMATION
PART I. FINANCIAL INFORMATION
Financial Statements
Item 1. Financial Statements 1 CenterPoint Energy, Inc. and Subsidiaries Financial Statements (Unaudited) 1 CenterPoint Energy Houston Electric, LLC and Subsidiaries Financial Statements (Unaudited) 7 CenterPoint Energy Resources Corp. and Subsidiaries Financial Statements (Unaudited) 11 Combined Notes to Interim Condensed Financial Statements (Unaudited) 17 (1) Background and Basis of Presentation 17 (2) Accounting Policies and Recent Accounting Pronouncements 18 (3) Acquisition and Divestiture 19 (4) Revenue Recognition 21 (5) Employee Benefit Plans 23 (6) Regulatory Matters 24 (7) Fair Value Measurements 28 (8) Equity Securities and Indexed Debt Securities (ZENS) 30 (9) Short-term Borrowings and Long-term Debt 31 (10) Income Taxes 34 (11) Commitments and Contingencies 35 (12) Earnings Per Share 42 (13) Reportable Segments 42 (14) Related Party Transactions 46 (15) Equity 47 (16) Subsequent Events 49
Management's Discussion and Analysis of Financial Condition and Results of Operations
Item 2. Management's Discussion and Analysis of Financial Condition and Results of Operations 51 Recent Events 51 Consolidated Results of Operations 53 Results of Operations by Reportable Segment 54 Certain Factors Affecting Future Earnings 63 Liquidity and Capital Resources 63
Quantitative and Qualitative Disclosures about Market Risk
Item 3. Quantitative and Qualitative Disclosures about Market Risk 76
Controls and Procedures
Item 4. Controls and Procedures 76
OTHER INFORMATION
PART II. OTHER INFORMATION
Legal Proceedings
Item 1. Legal Proceedings 77
Risk Factors
Item 1A. Risk Factors 77
Other Information
Item 5. Other Information 77
Exhibits
Item 6. Exhibits 77
Signatures
Signatures 81 i GLOSSARY AFUDC Allowance for funds used during construction AI Artificial intelligence ALJ Administrative Law Judge AMA Asset Management Agreement Arevon Arevon Energy, Inc., which was formed through the combination of Capital Dynamics, Inc.'s U.S. Clean Energy Infrastructure business unit and Arevon Asset Management ARO Asset retirement obligation ARP Alternative revenue program ASU Accounting Standards Update AT&T Common AT&T Inc. common stock ATM Forward Purchasers Bank of America, N.A., Barclays Bank PLC, Citibank, N.A., Goldman Sachs & Co. LLC, JPMorgan Chase Bank, National Association, Mizuho Markets Americas LLC, MUFG Securities EMEA plc and Royal Bank of Canada ATM Forward Sellers BofA Securities, Inc. Barclays Capital Inc., Citigroup Global Markets Inc., Goldman Sachs & Co. LLC, J.P. Morgan Securities LLC, Mizuho Securities USA LLC, MUFG Securities Americas Inc. and RBC Capital Markets, LLC ATM Managers BofA Securities, Inc., Barclays Capital Inc., Citigroup Global Markets Inc., Goldman Sachs & Co. LLC, J.P. Morgan Securities LLC, Mizuho Securities USA LLC, MUFG Securities Americas Inc. and RBC Capital Markets, LLC Bcf Billion cubic feet Board Board of Directors of CenterPoint Energy, Inc. Bond Companies Transition Bond Company IV and Restoration Bond Company II, each a consolidated VIE that is a wholly-owned, bankruptcy-remote, special purpose entity formed solely for the purpose of securitizing transition property or system restoration property through the issuance of transition bonds and system restoration bonds BTA Build Transfer Agreement CAMT Corporate Alternative Minimum Tax CCN Certificate of Convenience and Necessity CCR Coal Combustion Residuals CECA Clean Energy Cost Adjustment CEIP CenterPoint Energy Intrastate Pipelines, LLC, a wholly-owned subsidiary of CERC Corp. CenterPoint Energy CenterPoint Energy, Inc., and its subsidiaries CEOH Vectren Energy Delivery of Ohio, LLC, doing business as